CT Primary Bath Update

CONCEPTUAL RENDERING
Before Natural Daylight

Before Vanity in Daylight

After Natural Daylight

After Vanity in Daylight

Before Artificial Light

Before Vanity in Artificial Light

Vanity in Artificial Light

After Vanity in Artificial Light

After Natural Light

After Vanity Details in Natural Light

After Artificial Light

After Vanity Details in Artificial Light

Primary Bath 6

After Vanity and Blinds in Artificial Light

The goal of this project was to update the primary bathroom of a home in Connecticut's Farmington Valley. The bathroom had good bones with double sinks, a shower, and a jacuzzi tub, however, the finishes were generic and the plumbing was leaking. All of the plumbing was fixed, a new shower enclosure was installed, new cordless blinds dressed up the window, the vanity countertop, sinks, and faucets were replaced, the electrical was brought up to code, and new lighting and a moisture-control fan installed. The entire project was completed below the owner's original budget and local tradespeople were used throughout. 

  • Instagram Social Icon
  • Facebook Social Icon
  • Pinterest Social Icon
  • Twitter Social Icon
  • LinkedIn Social Icon

© 2019-2021 by Design Logica LLC

Website Design By Irene and Ana Banks